Starzer, Alley, and Spruce Hall Limited Access for Service Vehicles and Access Construction Outage June 10 – July 31, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 6, 2024

To: Facilities Management
From: David Feron
Emergency Contact Info: 301-461-5354

Outage Date: June 10, 2024 thru July 31, 2024
Outage Time: 24/7
Purpose: Boring
System(s) Involved: Roads narrowing to one lane, and no access to service vehicle spaces

Effect(s) on Occupants: Access to Alley between 17th and 18th and to Service vehicle spaces
The contractors for Energy and Mineral Research Facility will be working on 18th Street between Illinois and the fire lane at Spruce Hall. Along with the alley between Maple Hall and the houses on Illinois St. This work consists of underground boring, which areas will be needed for staging piping, and large dirt piles.
This work will begin on Monday June 10, 2024, and last through July 31, 2024. There will be one lane access on the north side of 18th St. The parking in front of Starzer Welcome Center will be consumed by the construction, with the exception of the ADA spaces, those will not be disturbed.
The work in the alley will close access to the alley at 17th St., with the only access to the alley from 18th St., and this will leave one lane open for access to the back of the houses for parking, for Facilities, and for trash pickup.
As far as the impact on Spruce Hall, there will be access to the fire lane, and ADA parking, up until July 8 – 19. At that time the access to Spruce will be closed.

Recurring

Berthoud Hall Preventive Maintenance July 15 – 17, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 25, 2024

To: Berthoud Hall Occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: July 15 - 17, 2024
Outage Time: 5:30am - 3:30pm daily
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units, exhaust fans, and air compressors

Effect(s) on Occupants: Very brief fluctuating space temperatures, heating and cooling will still be active, intermittent exhaust fan flow, intermittent Lab fume hood flow, personnel in and out of building spaces and corridors. Compressed air to the labs will not be affected.

Recurring

Brown Hall Cooling Service Maintenance July 15 – 19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 26, 2024

To: Brown Hall Occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: July 15 -19, 2024
Outage Time: 5:30am - 3:30pm daily
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units

Effect(s) on Occupants: Fluctuating space temperatures, cooling will still be active but less effective, exhaust fan flow and lab fume hood flow should not be affected. Personnel in and out of building, spaces, and corridors.

Recurring

Starzer, Alley, and Spruce Hall Limited Access for Service Vehicles and Access Construction Outage June 10 – July 31, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 6, 2024

To: Facilities Management
From: David Feron
Emergency Contact Info: 301-461-5354

Outage Date: June 10, 2024 thru July 31, 2024
Outage Time: 24/7
Purpose: Boring
System(s) Involved: Roads narrowing to one lane, and no access to service vehicle spaces

Effect(s) on Occupants: Access to Alley between 17th and 18th and to Service vehicle spaces
The contractors for Energy and Mineral Research Facility will be working on 18th Street between Illinois and the fire lane at Spruce Hall. Along with the alley between Maple Hall and the houses on Illinois St. This work consists of underground boring, which areas will be needed for staging piping, and large dirt piles.
This work will begin on Monday June 10, 2024, and last through July 31, 2024. There will be one lane access on the north side of 18th St. The parking in front of Starzer Welcome Center will be consumed by the construction, with the exception of the ADA spaces, those will not be disturbed.
The work in the alley will close access to the alley at 17th St., with the only access to the alley from 18th St., and this will leave one lane open for access to the back of the houses for parking, for Facilities, and for trash pickup.
As far as the impact on Spruce Hall, there will be access to the fire lane, and ADA parking, up until July 8 – 19. At that time the access to Spruce will be closed.

Recurring

Brown Hall Cooling Service Maintenance July 15 – 19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 26, 2024

To: Brown Hall Occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: July 15 -19, 2024
Outage Time: 5:30am - 3:30pm daily
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units

Effect(s) on Occupants: Fluctuating space temperatures, cooling will still be active but less effective, exhaust fan flow and lab fume hood flow should not be affected. Personnel in and out of building, spaces, and corridors.

1750 Jackson Domestic Hot Water Outage July 18, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: July 17, 2024

To: 1750 Jackson Occupants
From: Craig Crow
Emergency Contact Info: 303-421-0832

Outage Date: July 18, 2024
Outage Time: 7:00am - 3:30pm
Purpose: Repair piping leak.
System(s) Involved: Domestic Hot Water

Effect(s) on Occupants: The building will have impaired domestic hot to all plumbing fixtures until repair is complete.

Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call
Craig Crow at 303-421-0832.

Recurring

Starzer, Alley, and Spruce Hall Limited Access for Service Vehicles and Access Construction Outage June 10 – July 31, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 6, 2024

To: Facilities Management
From: David Feron
Emergency Contact Info: 301-461-5354

Outage Date: June 10, 2024 thru July 31, 2024
Outage Time: 24/7
Purpose: Boring
System(s) Involved: Roads narrowing to one lane, and no access to service vehicle spaces

Effect(s) on Occupants: Access to Alley between 17th and 18th and to Service vehicle spaces
The contractors for Energy and Mineral Research Facility will be working on 18th Street between Illinois and the fire lane at Spruce Hall. Along with the alley between Maple Hall and the houses on Illinois St. This work consists of underground boring, which areas will be needed for staging piping, and large dirt piles.
This work will begin on Monday June 10, 2024, and last through July 31, 2024. There will be one lane access on the north side of 18th St. The parking in front of Starzer Welcome Center will be consumed by the construction, with the exception of the ADA spaces, those will not be disturbed.
The work in the alley will close access to the alley at 17th St., with the only access to the alley from 18th St., and this will leave one lane open for access to the back of the houses for parking, for Facilities, and for trash pickup.
As far as the impact on Spruce Hall, there will be access to the fire lane, and ADA parking, up until July 8 – 19. At that time the access to Spruce will be closed.

Recurring

Brown Hall Cooling Service Maintenance July 15 – 19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 26, 2024

To: Brown Hall Occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: July 15 -19, 2024
Outage Time: 5:30am - 3:30pm daily
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units

Effect(s) on Occupants: Fluctuating space temperatures, cooling will still be active but less effective, exhaust fan flow and lab fume hood flow should not be affected. Personnel in and out of building, spaces, and corridors.

Recurring

Starzer, Alley, and Spruce Hall Limited Access for Service Vehicles and Access Construction Outage June 10 – July 31, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 6, 2024

To: Facilities Management
From: David Feron
Emergency Contact Info: 301-461-5354

Outage Date: June 10, 2024 thru July 31, 2024
Outage Time: 24/7
Purpose: Boring
System(s) Involved: Roads narrowing to one lane, and no access to service vehicle spaces

Effect(s) on Occupants: Access to Alley between 17th and 18th and to Service vehicle spaces
The contractors for Energy and Mineral Research Facility will be working on 18th Street between Illinois and the fire lane at Spruce Hall. Along with the alley between Maple Hall and the houses on Illinois St. This work consists of underground boring, which areas will be needed for staging piping, and large dirt piles.
This work will begin on Monday June 10, 2024, and last through July 31, 2024. There will be one lane access on the north side of 18th St. The parking in front of Starzer Welcome Center will be consumed by the construction, with the exception of the ADA spaces, those will not be disturbed.
The work in the alley will close access to the alley at 17th St., with the only access to the alley from 18th St., and this will leave one lane open for access to the back of the houses for parking, for Facilities, and for trash pickup.
As far as the impact on Spruce Hall, there will be access to the fire lane, and ADA parking, up until July 8 – 19. At that time the access to Spruce will be closed.

Beck Venture Center Electric Outage July 20, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 20, 2024

To: Beck Venture Center
From: Robert Lee, Office of Design and Construction
Emergency Contact Info: 303-263-0263

Outage Date: July 20, 2024
Outage Time: 7:00am to 2:00pm
Purpose: Electrical outage
System(s) Involved: The power throughout the Beck Venture Center will be shut down. Normal building occupancy will not be permitted during this time.

Effect(s) on Occupants: No access to Beck Venture Center during this outage.

Recurring

Starzer, Alley, and Spruce Hall Limited Access for Service Vehicles and Access Construction Outage June 10 – July 31, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 6, 2024

To: Facilities Management
From: David Feron
Emergency Contact Info: 301-461-5354

Outage Date: June 10, 2024 thru July 31, 2024
Outage Time: 24/7
Purpose: Boring
System(s) Involved: Roads narrowing to one lane, and no access to service vehicle spaces

Effect(s) on Occupants: Access to Alley between 17th and 18th and to Service vehicle spaces
The contractors for Energy and Mineral Research Facility will be working on 18th Street between Illinois and the fire lane at Spruce Hall. Along with the alley between Maple Hall and the houses on Illinois St. This work consists of underground boring, which areas will be needed for staging piping, and large dirt piles.
This work will begin on Monday June 10, 2024, and last through July 31, 2024. There will be one lane access on the north side of 18th St. The parking in front of Starzer Welcome Center will be consumed by the construction, with the exception of the ADA spaces, those will not be disturbed.
The work in the alley will close access to the alley at 17th St., with the only access to the alley from 18th St., and this will leave one lane open for access to the back of the houses for parking, for Facilities, and for trash pickup.
As far as the impact on Spruce Hall, there will be access to the fire lane, and ADA parking, up until July 8 – 19. At that time the access to Spruce will be closed.

Recurring

Starzer, Alley, and Spruce Hall Limited Access for Service Vehicles and Access Construction Outage June 10 – July 31, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: June 6, 2024

To: Facilities Management
From: David Feron
Emergency Contact Info: 301-461-5354

Outage Date: June 10, 2024 thru July 31, 2024
Outage Time: 24/7
Purpose: Boring
System(s) Involved: Roads narrowing to one lane, and no access to service vehicle spaces

Effect(s) on Occupants: Access to Alley between 17th and 18th and to Service vehicle spaces
The contractors for Energy and Mineral Research Facility will be working on 18th Street between Illinois and the fire lane at Spruce Hall. Along with the alley between Maple Hall and the houses on Illinois St. This work consists of underground boring, which areas will be needed for staging piping, and large dirt piles.
This work will begin on Monday June 10, 2024, and last through July 31, 2024. There will be one lane access on the north side of 18th St. The parking in front of Starzer Welcome Center will be consumed by the construction, with the exception of the ADA spaces, those will not be disturbed.
The work in the alley will close access to the alley at 17th St., with the only access to the alley from 18th St., and this will leave one lane open for access to the back of the houses for parking, for Facilities, and for trash pickup.
As far as the impact on Spruce Hall, there will be access to the fire lane, and ADA parking, up until July 8 – 19. At that time the access to Spruce will be closed.